Steer Decorating
Dennis Terrell, Andrew Anaya (2000)
This event requires a two-person team. One member stands ten feet from the chute gate holding the end of a 25 foot rope, which is looped around the steer's horns. The other team member stands 40 feet from the chute and has a 24 inch long ribbon. When the chute gate opens, the team must bring the steer out and across the ten foot line. One team member tries to tie the ribbon on the steer's tail while the other team member tries to remove the rope from the steer's horns. |